Start with the two buildings, not the boxes
The instinct on day one is to order boxes. Resist it. The two buildings control the schedule, and their calendars fill up long before yours does.
Call the property manager at each end and get the loading rules in writing. Ask when the dock is open and whether it requires a reservation. Ask which elevator handles freight, how it gets booked, and how far out the calendar runs. In downtown Portland towers the freight elevator is often shared by every tenant on twenty floors, and the building may require moves to happen after 6pm or on weekends. Some buildings also require padding in the elevator cab and floor protection through the lobby, and they will want to know who is installing it.
Property managers in managed buildings almost always require a certificate of insurance from any vendor working on site, naming the building with specific coverage language. Collect the COI requirements from both buildings early and pass them along during the quote process, so the paperwork is settled before the crew is standing at a locked dock. This is routine for a commercial moving operation, but only if the requirements show up before move day instead of during it.
Then look at where the truck actually stands. A private dock or garage solves it. If street loading is unavoidable, reserved curb space in Portland goes through PBOT's Temporary Street Use Permitting process, and the review and sign requirements add days of lead time. The moving truck parking permit guide walks through that process in detail.
Inventory and sequencing
The next question is not what the old office holds. It is what the new space needs. Get the new floor plan, count the seats, the conference rooms, and the storage, and work out what fits. Most offices discover they are moving less than they thought, and the ones that discover it before packing day save a full round of handling.
Decommission and purge before the move, not after. Surplus desks, dead monitors, chairs nobody claimed, and the file boxes from a vendor who closed in 2019 should leave the building on their own schedule, through donation, resale, or e-waste. Anything that rides the truck twice costs twice.
Everything that remains gets a tag. Every desk, chair, monitor, and file cabinet gets a label that maps it to a destination: a seat number, a room, or a storage area on the new floor plan. The crew should never have to ask where something goes while holding it.
Then sequence the load. Last out, first in. The things people need on the first morning, workstations for the front desk, the sales team's monitors, the one printer everyone actually uses, go on the truck last so they come off first. Archives and spare furniture load early and can even skip the new office entirely. If the new space is not ready for everything, or the two leases do not overlap cleanly, storage works as swing space for the overflow instead of stacking it in a conference room you need on Monday.
The IT plan decides the downtime
Furniture arrives on time or it does not, and either way people can work around it for a day. The network is different. If the internet is not live at the new address on the first morning, the move failed, no matter how clean the furniture placement looks.
Order the cutover at the new address as early as the lease allows. Carrier install timelines are measured in weeks, not days, and a new circuit in an older building can take longer. Before signing anything, check what service is actually available at the address with the FCC's National Broadband Map, then confirm the install date with the carrier and hold them to it.
Divide the technical work cleanly. Servers, networking gear, and workstations get disconnected and reconnected by your IT people or your IT vendor, who know the passwords, the configurations, and the order things have to come back up. The movers handle what movers are for: safe transport and staging, with each machine padded, boxed, and delivered to the right seat. That split only works if labels carry it. Every cable, dock, monitor, and tower gets marked to a seat number before disconnect, so the IT team reconnects down a row instead of sorting a pile.
Phones, printers, and conference room gear belong on the same list. The number of offices that arrive without anyone owning the printer setup is higher than you would guess.

Employee packing that actually happens
Employee packing fails when it is a suggestion. It works when it is one container and one deadline.
Give each person one crate or box for the contents of their own desk, labeled with their name and their new seat number, and set a firm deadline, usually end of day before the move. One container forces decisions. Three invites hoarding.
Personal items go home with the employee, not on the truck. Plants, framed photos, the good headphones, the spare chargers. Nobody wants to file a claim over a succulent, and nobody wants to unpack one either.
Common areas do not pack themselves. The kitchen, the supply room, reception, and each conference room get a named owner, because a space that belongs to everyone gets packed by no one. Put the names on the move plan next to the rooms.
Schedule a purge day before packing day. Bins out, shred vendor if needed, and permission to throw things away. Half of what sits in office drawers exists because nobody was ever explicitly allowed to discard it.
Timing the move to protect the workweek
The move itself usually lands on an evening or a weekend, and that is not a coincidence. A Friday evening start gives the crew the dock, the elevator, and the empty freight corridors, gives IT the weekend to bring the network up, and gives the business a normal Monday. Many managed buildings will not allow it any other way.
Larger offices phase it. Departments move over successive evenings or weekends, and each phase is a complete unit: furniture, files, and workstations for that group, staged so the group works from the new space the next morning while the rest of the office runs from the old one. Phasing costs some coordination and buys a business that never fully stops.
Decide what stays live until the last day. Usually that is the phone system, one printer, and the workstations for whoever faces customers. Those are the last things disconnected and the first things reconnected, which is exactly why they load last.
Portland adds two local wrinkles. Tower freight elevator calendars downtown fill weeks out, so the building reservation, not the mover, is often the real constraint on the date. And the route between the two buildings matters at the hour you are driving it. A crew crossing the Morrison Bridge at 5pm on a Friday is not moving, it is parking. Check TripCheck for closures and conditions on the route the evening of the move, and let the crew route around what it shows.
A 7-item office move checklist
- Get dock hours, freight elevator reservations, and COI requirements from both buildings in writing.
- Order the internet cutover at the new address and confirm the install date with the carrier.
- Build a tagged inventory that maps every desk, chair, monitor, and cabinet to a destination on the new floor plan.
- Run decommission and purge before packing day so nothing rides the truck twice.
- Book your IT people or vendor for disconnect at the old office and reconnect at the new one, with every cable and machine labeled to a seat.
- Issue one labeled crate per employee with a firm deadline, and assign named owners to every common area.
- Walk both spaces with the moving crew lead before move day and agree on the load sequence.
Where Pearl Movers fits
Scope the move from a walkthrough, not a guess
Pearl Movers scopes commercial requests from a walkthrough of both spaces, the inventory, and the building rules at each end. Bring the floor plans, the dock and elevator windows, and the COI requirements from both property managers, and the crew plan gets built around them. IT disconnect and reconnect stays with your IT team or vendor; the crew handles transport and staging to labeled seats.
Review the commercial moving service or request a quote with the addresses, the target weekend, and the building rules attached.
Common questions
Portland office moving FAQs
How long does an office move take?
It scales with headcount, floors, and IT complexity. A small office with a tagged inventory and a ready network often moves in an evening. Larger offices usually move in phases over one or more weekends. Treat any duration as a planning estimate for your specific building rules and inventory, not a promise.
Should we move the office during business hours?
Usually no. An evening or weekend window keeps staff productive, keeps the freight elevator clear, and avoids moving furniture through a lobby full of clients. Some buildings require after-hours moves anyway. A daytime move can work for a small office with separate entrances, but plan it deliberately rather than by default.
Who handles the IT equipment during an office move?
Your IT staff or IT vendor should disconnect servers, networking gear, and workstations before the move and reconnect them at the new space. The moving crew handles safe transport and staging, delivering each labeled machine to its assigned seat so the IT team can work down a row instead of hunting through boxes.
How far ahead should an office move be planned?
The buildings and the internet cutover set the floor. Freight elevator calendars in managed buildings can book out weeks ahead, and a new circuit at the new address can take longer than that to install. Start planning as soon as the lease dates are firm, and confirm the dock, elevator, and install dates before choosing the move date.
What do employees pack themselves?
Each person packs the contents of their own desk into one labeled crate or box by a firm deadline, and takes personal items such as plants, photos, and chargers home in their own car. Common areas like the kitchen, supply room, and reception get assigned to named owners so they do not go unpacked.
Local planning references
Official and authoritative sources used
- PBOT Temporary Street Use Permitting
- FCC National Broadband Map guide
- ODOT TripCheck road conditions
Permit, parking, construction, and access rules can change. Confirm current requirements with the responsible city, county, property manager, association, or service provider before move day.